The CEGB approach to defining the commissioning tests for prime movers

Creators

  • 1. CEGB, Generation Development and Construction Division, Barnett Way, Barnwood, Gloucester GL4 7RS (United Kingdom)

Description

This paper describes the CEGB approach to demonstrating during commissioning the adequacy of the reliability of the large on-site essential electrical power sources installed in the CAGR power stations. In this approach the reliability requirements of the essential electrical supplies at the power stations are defined and then the reliability requirements of the particular gas turbine and diesel generator installation derived. The paper outlines the probabilistic methods used in arriving at the specific start and run test programmes which were subsequently carried out. The results achieved in these test programmes in demonstrating that the reliability requirements were satisfied, are presented In the paper. (author)

Files

47076527.pdf

Files (319.6 kB)

Name Size Download all
md5:8f7b7d9cda48584f78d370085936d3c3
319.6 kB Preview Download
Part of:
Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting

Additional details

Publishing Information

Imprint Title
Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting
Imprint Pagination
399 p.
Journal Page Range
p. 278-287
Report number
NEA-CSNI-R--1986-115

Conference

Title
CSNI specialist meeting on operating experience relating to on-site electric power sources
Dates
16-18 Oct 1985
Place
London (United Kingdom)

Optional Information