Published 2008 | Version v1
Miscellaneous

Preliminary dismantling for the decommissioning of nuclear licensed facilities at the CEA Centre in Fontenay aux Roses

  • 1. CEA Fontenay-aux-Roses, Nuclear Energy Div., Nuclear Activities Sub-Div., Saclay, Dept. of Reactors and Nuclear Services, Clean-up Dept., 92 (France)

Description

Under the perimeter modification programme for the Nuclear Licensed Facilities (NLFs) of the French Atomic Energy Commission centre at Fontenay aux Roses (CEN-FAR), preliminary dismantling work proved necessary to decommission the buildings outside the nuclear perimeter and create interim storage areas for waste packages. This summary describes the dismantling of Buildings 07, 53 and 91/54, which are the most representative of the preliminary dismantling work. (author)

Part of:
Decommissioning challenges: an industrial reality?

Additional details

Additional titles

Original title (English)
Les defis du demantelement: une realite industrielle?

Publishing Information

Imprint Title
Decommissioning challenges: an industrial reality?
Imprint Pagination
2256 p.
Journal Page Range
p. 1322-1327
Report number
INIS-FR--09-1169

Conference

Title
an industrial reality?
Original Conference Title
Conference les defis du demantelement: une realite industrielle?
Acronym
Conference decommissioning challenges
Dates
28 Sep - 2 Oct 2008
Place
Avignon (France)

INIS

Country of Publication
France
Country of Input or Organization
France
INIS RN
40102127
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CEA FONTENAY-AUX-ROSES; CLEANING; PROGRAM MANAGEMENT; RADIOACTIVE WASTE MANAGEMENT; REACTOR DISMANTLING; REMOTE HANDLING EQUIPMENT
Descriptors DEC
CEA; DEMOLITION; EQUIPMENT; FRENCH ORGANIZATIONS; MANAGEMENT; MATERIALS HANDLING EQUIPMENT; NATIONAL ORGANIZATIONS; WASTE MANAGEMENT

Optional Information

Notes
Imprint:Les defis du demantelement: une realite industrielle?