Contributions to the 14. Geoengineering congress in Munich. Geoengineering with the parameters time and quality
Description
This proceedings contains the following twelve papers: Why time and quality play a role? (Gebhard Dausch); Models for settlement prediction of structures in opencast dumps (Emanuel Birle, Stefan Vogt); Quality improvement and risk reduction through alternative proposals? Example: Intake structure of a coal-fired plant Wilhelmshaven (Thomas Brand, Friderike Hamm); History and methodology of the development of the combined pile and raft foundation (Rolf Katzenbach); Hazardous waste dump at Malsch - long-term monitoring of the safety measures (Walter Laechler, Fred Dietzel); Murphy's Law on the example of Protzenweiher Bridge (Markus Herten, Andreas Beier); ''Permanent anchor'' - state of the art and long-term experience with the durability of ground anchors (Karsten Beck House, Henning Lesemann); Optimized quality management of the implementation of DSM-works (W. Sondermann, W. Wehr); Subway construction in Doha on the example of the Green Line (Guenther Heilmayer); Marmaray Project - Bosphorus Crossing tunnels and stations - Geotechnical Aspects (Nurettin Demir); Crossrail C310 Thames Tunnel, geotechnical and tunnel construction challenges in urban tunnelling with variable ground conditions (Andreas Raedle, Stephan Assenmacher, Esters Sophia Karl); Proof concept of establishing the underground central station Stuttgart 21 - Numerical modeling and calibration (Roberto Cudmani).
Availability note (English)
Available from TIB HannoverAbstract (German)
Dieser Tagungsband enthaelt folgende zwoelf Beitraege: Warum Zeit und Qualitaet eine Rolle spielen (Gebhard Dausch); Modelle zur Setzungsprognose von Bauwerken auf Tagebaukippen (Emanuel Birle, Stefan Vogt); Qualitaetsverbesserung und Risikominimierung durch Sondervorschlaege? Beispiel: Entnahmebauwerk Kohlekraftwerk Wilhelmshaven (Thomas Brand, Friderike Hamm); Historie und Methodik der Entwicklung der Kombinierten Pfahl-Plattengruendung (KPP) (Rolf Katzenbach); Langzeitkontrolle der Sicherungsmassnahmen der Sonderabfalldeponie Malsch (Walter Laechler, Fred Dietzel); Murphy's Gesetz am Beispiel der Protzenweiher Bruecke (Markus Herten, Andreas Beier); ''Daueranker'' - Stand der Technik und Langzeiterfahrungen zur Dauerhaftigkeit von Verpressankern (Karsten Beckhaus, Henning Lesemann); Optimiertes Qualitaetsmanagement fuer die Ausfuehrung von DSM-Arbeiten (W. Sondermann, W. Wehr); U-Bahnbau in Doha am Beispiel der Green Line (Guenther Heilmayer); Marmaray Project - Bosphorus Crossing Tunnels and Stations - Geotechnical Aspects (Nurettin Demir); Crossrail C310 Thames Tunnel, geotechnical and tunnel construction challenges in urban tunnelling with variable ground conditions (Andreas Raedle, Stephan Assenmacher, Ester Sophia Karl); Nachweiskonzept der Gruendung des unterirdischen Hauptbahnhofs Stuttgart 21 - Numerische Modellierung und Kalibrierung (Roberto Cudmani).Additional details
Additional titles
- Original title (German)
- Beitraege zum 14. Geotechnik-Tag in Muenchen. Geotechnik mit den Parametern Zeit und Qualitaet
Publishing Information
- ISBN
- 978-3-943683-32-5
- Imprint Pagination
- 184 p.
- Journal Volume
- 58
- Series
- Technische Universitaet Muenchen, Lehrstuhl und Pruefamt fuer Grundbau, Bodenmechanik, Felsmechanik und Tunnelbau. Schriftenreihe
Conference
- Title
- 14. Geoengineering congress
- Original Conference Title
- 14. Geotechnik-Tag
- Dates
- 27 Mar 2015
- Place
- Muenchen (Germany)
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 47065387
- Subject category
- S54: ENVIRONMENTAL SCIENCES; S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Is Lead record
- Yes
- Descriptors DEI
- ANCHORS; CONSTRUCTION; ENGINEERING GEOLOGY; FORECASTING; FOSSIL-FUEL POWER PLANTS; FOUNDATIONS; INTAKE STRUCTURES; LEADING ABSTRACT; MEETINGS; MONITORING; QUALITY ASSURANCE; SAFETY; SANITARY LANDFILLS; TUNNELS; UNDERGROUND
- Descriptors DEC
- ABSTRACTS; GEOLOGY; LEVELS; MANAGEMENT; MECHANICAL STRUCTURES; POWER PLANTS; SUPPORTS; THERMAL POWER PLANTS; UNDERGROUND FACILITIES; WASTE DISPOSAL; WASTE MANAGEMENT