Published November 1976 | Version v1
Report Restricted

Staff discussion of fifteen technical issues listed in attachment to November 3, 1976 memorandum from Director, NRR to NRR staff

Description

Issues discussed include: treatment of non-safety grade equipment in evaluation of a postulated steamline break accidents, lack of independence of interlocks in ECCS valves, acceptability of swing bus design of BWR-4 plants, loss of offsite power subsequent to manual safety injection reset following a LOCA, postulated reactor coolant pump rotor seizures, single failures in reactivity control, passive failures following a LOCA, probabilistic assessment of reliability, frequency decay, grid stability, interpretation of GDC 19, load break switch, instrument trip setpoints, computer protection system, and overpressurization

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
v p.
Report number
NUREG--0138

Optional Information

Notes
Available from NTIS. $7.75.