Published March 2012 | Version v1
Journal article

Verification of Taishan NPP units 1 and 2 design availability factor

Creators

  • 1. China Nuclear Power Engineering Co., Ltd., Shenzhen (China)

Description

Appendix 5L 2.1 nuclear island engineering and supply contract (NIEP) of Taishan NPP Units 1 and 2 requires: the average design availability factor is 92%, for a fuel cycle ≥18 months, over a 20 year-period. The performance assessment methodology in EUR Volume 2, Chapter 18 is analyzed and the error in the EUR formula is modified, which is validated by verifying Taishan NPP Units 1 and 2 design availability factor. It can be used as a reference for determining and evaluating the design availability factor performance indicator for a new nuclear power plant design. (author)

Additional details

Publishing Information

Journal Title
Chinese Journal of Nuclear Science and Engineering
Journal Volume
32
Journal Issue
1
Journal Page Range
p. 93-96
ISSN
0258-0918

Optional Information

Notes
1 figs., 1 tabs., 1 refs.