Verification of Taishan NPP units 1 and 2 design availability factor
Description
Appendix 5L 2.1 nuclear island engineering and supply contract (NIEP) of Taishan NPP Units 1 and 2 requires: the average design availability factor is 92%, for a fuel cycle ≥18 months, over a 20 year-period. The performance assessment methodology in EUR Volume 2, Chapter 18 is analyzed and the error in the EUR formula is modified, which is validated by verifying Taishan NPP Units 1 and 2 design availability factor. It can be used as a reference for determining and evaluating the design availability factor performance indicator for a new nuclear power plant design. (author)
Additional details
Publishing Information
- Journal Title
- Chinese Journal of Nuclear Science and Engineering
- Journal Volume
- 32
- Journal Issue
- 1
- Journal Page Range
- p. 93-96
- ISSN
- 0258-0918
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 46127512
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AVAILABILITY; CHINA; DESIGN; ENGINEERING; ERRORS; EURATOM; FUEL CYCLE; NUCLEAR POWER PLANTS; PERFORMANCE; PWR TYPE REACTORS; VERIFICATION
- Descriptors DEC
- ASIA; ENRICHED URANIUM REACTORS; EUROPEAN UNION; INTERNATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 1 figs., 1 tabs., 1 refs.