A study of the utility of heat collectors in reducing the response time of automatic fire sprinklers located in production modules of Building 707
Creators
- 1. Hughes Associates, Inc., Wheaton, MD (United States)
Description
Several of the ten production Modules in Building 707 at the Department of Energy Rocky Flats Plant recently underwent an alteration which can adversely affect the performance of the installed automatic fire sprinkler systems. The Modules have an approximate floor to ceiling height of 17.5 ft. The alterations involved removing the drop ceilings in the Modules which had been at a height of 12 ft above the floor. The sprinkler systems were originally installed with the sprinkler heads located below the drop ceiling in accordance with the nationally recognized NFPA 13, Standard for the Installation of Automatic Sprinkler Systems. The ceiling removal affects the sprinkler's response time and also violates NFPA 13. The scope of this study included evaluation of the feasibility of utilizing heat collectors to reduce the delays in sprinkler response created by the removal of the drop ceilings. The study also includes evaluation of substituting quick response sprinklers for the standard sprinklers currently in place, in combination with a heat collector
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE94017417; NTIS; US Govt. Printing Office Dep.Files
26011203.pdf
Files
(4.8 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:7a999600aa1218af383f5478007ec924
|
4.8 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 86 p.
- Report number
- RFP--4874
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26011203
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
- Descriptors DEI
- DESIGN; FEASIBILITY STUDIES; FIRE DETECTORS; FIRE EXTINGUISHERS; MODIFICATIONS; NUCLEAR FACILITIES; PERFORMANCE; POSITIONING; RESPONSE FUNCTIONS; ROCKY FLATS PLANT; SAFETY; TIME DELAY
- Descriptors DEC
- FUNCTIONS; MEASURING INSTRUMENTS; NATIONAL ORGANIZATIONS; US AEC; US DOE; US ERDA; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC34-90DP62349
- Funding organization
- USDOE, Washington, DC (United States).