Phenix construction and operating experience
Creators
Description
The methods and principles adopted for the construction of Phenix, which was put into service virtually on schedule and at a cost approaching the initial estimate, are discussed. By the end of 1975, Phenix had already proved a valuable experience, since this power plant has been operating industrially since July 14, 1974, with availability greater than 73%. The operating results significantly confirm the options adopted for the project, and particularly the pool concept. Moreover, Phenix is a clean power plant, with almost undetectable gaseous wastes, a very low quantity of liquid wastes, and very low thermal wastes, thanks to its high efficiency (over 45%). The experience thus gained provides a solid base for the forthcoming construction of Super Phenix
Additional details
Publishing Information
- Publisher
- American Society of Mechanical Engineers.
- Imprint Place
- New York
- Imprint Title
- 1976 ASME-ANS international conference on advanced nuclear energy systems
- Journal Page Range
- p. 3-12.
Conference
- Title
- ASME-ANS joint international conference on advanced nuclear energy systems.
- Dates
- 13 Mar 1976.
- Place
- Pittsburgh, PA, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9379786
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; PERFORMANCE; PHENIX REACTOR; REACTOR OPERATION
- Descriptors DEC
- BREEDER REACTORS; ENRICHED URANIUM REACTORS; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; LIQUID METAL COOLED REACTORS; OPERATION; PLUTONIUM REACTORS; POWER REACTORS; REACTORS; SODIUM COOLED REACTORS
Optional Information
- Notes
- Imprint:See CONF-760303--.