Repetitive decontaminations at Commonwealth Edison BWRs

Description

Four of Commonwealth Edison Company's (CECo's) boiling water reactors (BWRs) have had both the primary reactor recirculation systems (RRS) and the reactor water cleanup systems (RWCU) decontaminated twice. A summary of these decontaminations is given. The two most recent decontaminations, Quad Cities-2, November 1986, and Dresden-2, December 1986, have not been previously reported but are briefly described here along with the results obtained. Each of these two decontamination projects was performed over a four-day period using a technique and procedures that have become almost routine with the CECo/LN decontaminations. Results of these decontaminations are given. The rate of recontamination at each plant between the two decontaminations is discussed. The three different decontamination process that have been used at CECo plants are compared from the points of view of effectiveness, quantity of waste generated, time for application, and final water quality

Additional details

Publishing Information

Journal Title
Trans. Am. Nucl. Soc.
Journal Volume
54
Series
Trans. Am. Nucl. Soc.
Journal Page Range
17
ISSN
0003-018X
CODEN
TANSA

Conference

Title
13. American Nuclear Society international meeting on nuclear power plant operation.
Dates
30 Aug - 3 Sep 1987.
Place
Chicago, IL (USA).

Optional Information

Secondary number(s)
CONF-870837--.