Incorporation of organizational failures in PSA
Creators
- 1. Univ. of California, Los Angeles (United States)
Description
A large portion of the work performed at nuclear power plants follows standardized flow paths. For example, although components on which the maintenance crew works differ from one assignment to the next, all assignments basically follow the same process: requesting, reviewing, planning, scheduling, executing, testing, and documenting the work. In general, the term open-quotes work processclose quotes is used to refer to a standardized sequence of tasks designed within the operational environment of an organization to achieve a specific goal. The predictable nature of work processes suggests that a systematic analysis can be conducted to identify the desirable design of the process and to develop performance measures with respect to the strengths and weaknesses in the process. Furthermore, because of the close relationship of the work process to plant performance and plant safety, it is believed that such an analysis will facilitate the inclusion of organizational factors into probabilistic safety assessment (PSA) methodology. The Work Process Analysis Model (WPAM) has been developed with these goals in mind
Additional details
Publishing Information
- Journal Title
- Transactions of the American Nuclear Society
- Journal Volume
- 68
- Journal Page Range
- p. 118-119.
- ISSN
- 0003-018X
- CODEN
- TANSAO
Conference
- Title
- American Nuclear Society (ANS) annual meeting.
- Dates
- 20-24 Jun 1993.
- Place
- San Diego, CA (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 25022598
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- MAINTENANCE; NUCLEAR POWER PLANTS; ORGANIZATIONAL MODELS; PERFORMANCE; PLANNING; PROBABILISTIC ESTIMATION; SAFETY; SAFETY ANALYSIS
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-930601--.