Published 1996
| Version v1
Journal article
Optimization of NPP and TPP maintenance programs
Description
A new structured approach to the maintenance program for NPP and TPP is proposed. The aim is to enhance efficiency by improving nuclear safety, reliability and availability of the plants. This will be achieved by replacing the system of scheduled preventive maintenance with actions of corrective maintenance. The new optimized program includes the following elements: reliability centred maintenance approach; technical diagnostics and forecasting; overall maintenance expenditure reduction; analysis and comparison of data; computerized system for maintenance management with necessary hardware and software. 3 figs., 8 refs
Additional details
Additional titles
- Original title (Bulgarian)
- Optimizirane na programite za tehnichesko obsluzhvane i remont na TETs i AETs
Publishing Information
- Journal Title
- Energetika (Sofia)
- Journal Volume
- 49
- Journal Issue
- 1-2
- Journal Page Range
- p. 24-28.
- ISSN
- 0324-1521
- CODEN
- ENGTBL
INIS
- Country of Publication
- Bulgaria
- Country of Input or Organization
- Bulgaria
- INIS RN
- 28034620
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S20: FOSSIL-FUELED POWER PLANTS;
- Descriptors DEI
- COMPUTERIZED CONTROL SYSTEMS; DATA ANALYSIS; EXPENDITURES; MAINTENANCE; NUCLEAR POWER PLANTS; OPTIMIZATION; RELIABILITY; REPAIR; THERMAL POWER PLANTS
- Descriptors DEC
- CONTROL SYSTEMS; NUCLEAR FACILITIES; ON-LINE CONTROL SYSTEMS; ON-LINE SYSTEMS; POWER PLANTS