Published August 12, 1981 | Version v1
Report Open

Human-factors control-room-design review draft audit report: Detroit Edison Company, Enrico Fermi Atomic Power Plant--Unit 2

Description

A human factors audit of the Fermi-2 control room was conducted April 27 through May 1, 1981. This report contains the audit team findings, organized according to the draft NUREG-0700 guidelines sections. The discrepancies identified during the audit are categorized according to their severity and the required schedule for their resolution

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.

Files

13665597.pdf

Files (547.8 kB)

Name Size Download all
md5:f9ff2826a156d2dc031edd8d2648ca19
547.8 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
34 p.
Report number
UCID--18965

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
13665597
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Descriptors DEI
CONTROL ROOMS; ENRICO FERMI-2 REACTOR; SPECIFICATIONS
Descriptors DEC
BWR TYPE REACTORS; POWER REACTORS; REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS