Published August 12, 1981
| Version v1
Report
Open
Human-factors control-room-design review draft audit report: Detroit Edison Company, Enrico Fermi Atomic Power Plant--Unit 2
Description
A human factors audit of the Fermi-2 control room was conducted April 27 through May 1, 1981. This report contains the audit team findings, organized according to the draft NUREG-0700 guidelines sections. The discrepancies identified during the audit are categorized according to their severity and the required schedule for their resolution
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A03/MF A01.Files
13665597.pdf
Files
(547.8 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:f9ff2826a156d2dc031edd8d2648ca19
|
547.8 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 34 p.
- Report number
- UCID--18965
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 13665597
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CONTROL ROOMS; ENRICO FERMI-2 REACTOR; SPECIFICATIONS
- Descriptors DEC
- BWR TYPE REACTORS; POWER REACTORS; REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS