Considerations for Implementing Earthquake Response Guidelines to Nuclear Power Plants
Creators
- 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)
Description
For the first time in Korea, four units of the Wolsung NPPs have experienced a manual shutdown due to the 2016 Gyeongju earthquake of M5.8 because the peak ground acceleration (PGA) of the ground motions that were recorded at the plant site during the earthquake exceeded the OBE acceleration. Based on this experience in Korea, the Nuclear Safety and Security Commission (NSSC) has decided to revise an earthquake reporting system. A direction of implementation is discussed in this paper. The revised plant response guidelines to an earthquake require a rapid decision-making. The OBE exceedance should be evaluated within two hours and a manual shutdown of the plant should be determined within four hours following an earthquake. To satisfy these requirements, it is recommended that adequate and plant-specific technical information be provided for operators and on-site personnel to estimate the physical conditions of vulnerable SSCs and determine if a shutdown of the plant is required.
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS 2017 Fall Meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2017 Fall Meeting of the KNS
- Dates
- 25-27 Oct 2017
- Place
- Kyungju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 49079229
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATION; DECISION MAKING; EARTHQUAKES; NUCLEAR POWER PLANTS; REACTOR SHUTDOWN; RECOMMENDATIONS; SAFETY
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; REACTOR LIFE CYCLE; SEISMIC EVENTS; SHUTDOWN; THERMAL POWER PLANTS
Optional Information
- Notes
- 3 refs