Application of mechanized material transport in uranium mine

Creators

  • 1. Uranove Doly, Zadni Chodov (Czechoslovakia). Odstepny Zavod Zapadni Cechy

Description

Mechanisms had to be developed for speeding up the transport of material to the underground while increasing work safety and hygiene, this in view of the continuously growing volume of uranium ore mining in the pit. Attention was concentrated mainly on problems of transporting long material through the pit to the mining face. Three types of mechanisms were developed: a suspended material cage which is used to transport material with a length of up to 4 m, a suspension element for the transport of long flanged tubes and a suspension element for the transport of rails. The previous method of material handling is characterized and the new method using the suspended cage is described in detail. The actual amount of material transported in one year is given as is the time needed for manual transport and for transport using the cage. Annual savings are calculated. The transport of tubes and rails using the two suspension elements is described and 14 photographs are published showing the developed mechanisms and their uses. (A.K.)

Additional details

Additional titles

Original title (Czech)
Vyuziti mechanizace pri doprave materialu v podminkach uranoveho dolu

Publishing Information

Journal Title
Rudy (Prague)
Journal Volume
34
Journal Issue
5
Series
Rudy (Prague).
Journal Page Range
116-121
ISSN
0483-5093
CODEN
RUDYA

INIS

Country of Publication
Czech Republic
Country of Input or Organization
Serbia and Montenegro
INIS RN
18060173
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Descriptors DEI
MATERIALS HANDLING; MATERIALS HANDLING EQUIPMENT; TRANSPORT; URANIUM MINES
Descriptors DEC
EQUIPMENT; MINES; UNDERGROUND FACILITIES