Application of mechanized material transport in uranium mine
Description
Mechanisms had to be developed for speeding up the transport of material to the underground while increasing work safety and hygiene, this in view of the continuously growing volume of uranium ore mining in the pit. Attention was concentrated mainly on problems of transporting long material through the pit to the mining face. Three types of mechanisms were developed: a suspended material cage which is used to transport material with a length of up to 4 m, a suspension element for the transport of long flanged tubes and a suspension element for the transport of rails. The previous method of material handling is characterized and the new method using the suspended cage is described in detail. The actual amount of material transported in one year is given as is the time needed for manual transport and for transport using the cage. Annual savings are calculated. The transport of tubes and rails using the two suspension elements is described and 14 photographs are published showing the developed mechanisms and their uses. (A.K.)
Additional details
Additional titles
- Original title (Czech)
- Vyuziti mechanizace pri doprave materialu v podminkach uranoveho dolu
Publishing Information
- Journal Title
- Rudy (Prague)
- Journal Volume
- 34
- Journal Issue
- 5
- Series
- Rudy (Prague).
- Journal Page Range
- 116-121
- ISSN
- 0483-5093
- CODEN
- RUDYA
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Serbia and Montenegro
- INIS RN
- 18060173
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Descriptors DEI
- MATERIALS HANDLING; MATERIALS HANDLING EQUIPMENT; TRANSPORT; URANIUM MINES
- Descriptors DEC
- EQUIPMENT; MINES; UNDERGROUND FACILITIES