Published 1992 | Version v1
Report Restricted

Life cycle cost analysis changes mixed waste treatment program at the Savannah River Site

Description

A direct result of the reduced need for weapons production has been a re-evaluation of the treatment projects for mixed (hazardous/radioactive) wastes generated from metal finishing and plating operations and from a mixed waste incinerator at the Savannah River Site (SRS). A Life Cycle Cost (LCC) analysis was conducted for two waste treatment projects to determine the most cost effective approach in response to SRS mission changes. A key parameter included in the LCC analysis was the cost of the disposal vaults required for the final stabilized wasteform(s) . The analysis indicated that volume reduction of the final stabilized wasteform(s) can provide significant cost savings. The LCC analysis demonstrated that one SRS project could be eliminated, and a second project could be totally ''rescoped and downsized.'' The changes resulted in an estimated Life Cycle Cost saving (over a 20 year period) of $270,000,000

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE93008072; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Subtitle (English)
Revision 1

Publishing Information

Imprint Pagination
15 p.
Report number
WSRC-MS--92-346-Rev.1

Conference

Title
1993 federal environmental restoration conference.
Dates
25-27 Mar 1993.
Place
Washington, DC (United States).

Optional Information

Contract/Grant/Project number
Contract AC09-89SR18035
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-9303105--1-Rev.1.