Tank 241-TX-104, cores 230 and 231 analytical results for the final report
Description
This document is the analytical laboratory report for tank 241-TX-104 push mode core segments collected between February 18, 1998 and February 23, 1998. The segments were subsampled and analyzed in accordance with the Tank 241-TX-104 Push Mode Core Sampling and Analysis Plan (TSAP) (McCain, 1997), the Data Quality Objective to Support Resolution of the Organic Complexant Safety Issue (Organic DQO) (Turner, et al., 1995) and the Safety Screening Data Quality Objective (DQO) (Dukelow, et.al., 1995). The analytical results are included in the data summary table. None of the samples submitted for Differential Scanning Calorimetry (DSC) and Total Alpha Activity (AT) exceeded notification limits as stated in the TSAP. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group in accordance with the Memorandum of Understanding (Schreiber, 1997) and are not considered in this report. Appearance and Sample Handling Attachment 1 is a cross reference to relate the tank farm identification numbers to the 222-S Laboratory LabCore/LIMS sample numbers. The subsamples generated in the laboratory for analyses are identified in these diagrams with their sources shown. Core 230: Three push mode core segments were removed from tank 241-TX-104 riser 9A on February 18, 1998. Segments were received by the 222-S Laboratory on February 19, 1998. Two segments were expected for this core. However, due to poor sample recovery, an additional segment was taken and identified as 2A. Core 231: Four push mode core segments were removed from tank 241-TX-104 riser 13A between February 19, 1998 and February 23, 1998. Segments were received by the 222-S Laboratory on February 24, 1998. Two segments were expected for this core. However, due to poor sample recovery, additional segments were taken and identified as 2A and 2B. The TSAP states the core samples should be transported to the laboratory within three calendar days from the time each segment is removed from the tank; this requirement was not met for the segments from Core 231
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050826; NTIS; INIS; US GOVT. PRINTING OFFICE DEP.Files
30039989.pdf
Files
(14.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:b1f16b3e085fe3eeab8f43d886e33459
|
14.3 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 647 p.
- Report number
- HNF-SD-WM-DP--305
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30039989
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CHEMICAL ANALYSIS; DRILL CORES; PLANNING; RADIOACTIVE WASTE STORAGE; RADIOACTIVE WASTES; REMEDIAL ACTION; STORAGE FACILITIES; WASTE RETRIEVAL
- Descriptors DEC
- MANAGEMENT; MATERIALS; RADIOACTIVE MATERIALS; STORAGE; WASTE MANAGEMENT; WASTE STORAGE; WASTES
Optional Information
- Contract/Grant/Project number
- Contract AC06-96RL13200
- Funding organization
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)