Examples of Implications of Different Planning and Characterization Strategies on Costs: French Reactor Siloé. Appendix IV

Creators

Description

The Siloé facility is an open pool type research reactor built in France in 1961 by the French Alternative Energies and Atomic Energy Commission (CEA). Located on the Grenoble site, it has been used mainly for fundamental research experiments, production of radioisotopes for medical use, materials testing and production of spiked silicon for industry. The reactor started operation in 1963. With an initial operating power of 15 MW, in 1967 it increased to an operating power of 30 MW and in 1972 to an operating power of 35 MW. In December 1997, the reactor was shut down and the post‑operational cleanout phase began, lasting until 2005. On 26 January 2005, the Nuclear Safety Authority authorized the CEA to permanently shut down the facility in order to start dismantling activities. The dismantling strategy is immediate dismantling through to release conditions, with reuse of the buildings.

Part of:
Data Analysis and Collection for Costing of Research Reactor Decommissioning: Final Report of the DACCORD Collaborative Project

Additional details

Publishing Information

Publisher
IAEA
Imprint Place
Vienna (International Atomic Energy Agency (IAEA))
ISBN
978-92-0-108621-1
Imprint Title
Data Analysis and Collection for Costing of Research Reactor Decommissioning: Final Report of the DACCORD Collaborative Project
Imprint Pagination
142 p.
Journal Issue
no. NW-T-2.12
Series
IAEA Nuclear Energy Series
Journal Page Range
p. 87-90
ISSN
1995-7807

Optional Information

Notes
Figs.
Secondary number(s)
STI/PUB--1942