Published July 1987
| Version v1
Report
Open
A Review of the Indian Fast Reactor Programme
Description
The total installed electricity generation capacity in India, as of end 1986, was 47.6 GWe, made up of 64% coal baaed thermal, 33% hydel and 3% nuclear. Total electricity generated during '86 was about 180 bKWh. The present annual compound growth rate of the installed capacity is about 8.5% and the total planned capacity by the end of 1990 is about 66 GWe. The demand for the electrical energy is growing continuously and the planned capacities will not be adequate to meet the demands. This year, there is power out in parts of the country due to drought
Files
45100180.pdf
Files
(609.4 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:a02c2ce8e32a67b831c48847b74f6c38
|
609.4 kB | Preview Download |
Additional details
Publishing Information
- Imprint Title
- Status of National Programmes on Fast Breeder Reactors. International Working Group on Fast Reactors, Twentieth Annual Meeting, Vienna, 24-27 March 1987
- Imprint Pagination
- 168 p.
- Journal Page Range
- p. 41-55
- Report number
- IWGFR--63
Conference
- Title
- 20. Annual Meeting of the International Working Group on Fast Reactors
- Dates
- 24-27 Mar 1987
- Place
- Vienna (Austria)
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 45100180
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CAPACITY; ELECTRICITY; ENERGY DEMAND; FAST REACTORS; INDIA; NUCLEAR POWER PLANTS; POWER GENERATION; REVIEWS
- Descriptors DEC
- ASIA; DEMAND; DEVELOPING COUNTRIES; DOCUMENT TYPES; EPITHERMAL REACTORS; NUCLEAR FACILITIES; POWER PLANTS; REACTORS; THERMAL POWER PLANTS
Optional Information
- Notes
- 2 figs.