Published August 1, 2000
| Version v1
Report
Restricted
High-power circulator test results at 350 and 700 MHz
Description
The high-power RF systems for the Accelerator Production of Tritium (APT) program require high-power circulators at 350 MHz and 700 MHz to protect 1 MW Continuous Wave (CW) klystrons from reflected power. The 350 MHz circulator is based on the CERN, EXF, and APS designs and has performed very well. The 700 MHz circulator is a new design. Prototype 700 MHz circulators have been high-power tested at Los Alamos National Laboratory (LANL). The first of these circulators has satisfied performance requirements. The circulator requirements, results from the testing, and lessons learned from this development are presented and discussed
Availability note (English)
Available from INIS in electronic form; Also available from OSTI as DE00768261; PURL: https://www.osti.gov/servlets/purl/768261-mHTJgQ/webviewable/
Files
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 4 p.
- Report number
- LA-UR--00-3726
Conference
- Title
- 20. International Linear Collider Conference (LINAC 2000)
- Dates
- 21-25 Aug 2000
- Place
- Monterey, CA (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 32026320
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CERN; DESIGN; ISOTOPE PRODUCTION; KLYSTRONS; PERFORMANCE; QUADRUPOLE LINACS; RF SYSTEMS; TESTING; TRITIUM
- Descriptors DEC
- ACCELERATORS; BETA DECAY RADIOISOTOPES; BETA-MINUS DECAY RADIOISOTOPES; ELECTRON TUBES; ELECTRONIC EQUIPMENT; EQUIPMENT; HYDROGEN ISOTOPES; INTERNATIONAL ORGANIZATIONS; ISOTOPES; LIGHT NUCLEI; LINEAR ACCELERATORS; MICROWAVE EQUIPMENT; MICROWAVE TUBES; NUCLEI; ODD-EVEN NUCLEI; RADIOISOTOPES; YEARS LIVING RADIOISOTOPES
Optional Information
- Contract/Grant/Project number
- W-7405-ENG-36
- Funding organization
- US Department of Energy (United States)