Published June 14, 1995 | Version v1
Report Open

Cathodic protection -- Addition of 6 anodes to existing rectifier 31

  • 1. Westinghouse Hanford Co., Richland, WA (United States)

Description

This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the cathodic protection system additions are installed, connected, and function as required by project criteria. The cathodic protection system is for the tank farms on the Hanford Reservation. The tank farms store radioactive wastes

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95015744; NTIS; US Govt. Printing Office Dep.

Files

27006155.pdf

Files (524.4 kB)

Name Size Download all
md5:aa2babc6c8ffd6904f3ab2d9961a4e40
524.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
17 p.
Report number
WHC-SD--W320-ATP-002

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).