Published November 1985 | Version v1
Journal article

Fuel assembly cooling experience at the FFTF IEM cell

  • 1. Westinghouse Hanford Company, Richland, WA

Description

To date, 13 fuel assemblies requiring forced cooling have been processed through the Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell. Of these, two assemblies experienced overtemperature conditions due to inadequate forced cooling. Both of the occurrences have contributed significantly to the process of learning how to operate a fuel assembly cooling system remotely in an argon atmosphere hot cell. Many innovations have been made to the cooling system to enhance safety and increase productivity, and are briefly described

Additional details

Publishing Information

Journal Title
Trans. Am. Nucl. Soc.
Journal Volume
50
Series
Trans. Am. Nucl. Soc.
Journal Page Range
600-601
ISSN
0003-018X
CODEN
TANSA

Conference

Title
American Nuclear Society winter meeting.
Dates
10-15 Nov 1985.
Place
San Francisco, CA (USA).

Optional Information

Secondary number(s)
CONF-851115--.