Published July 30, 1992 | Version v1
Journal article

Down in the dumps [plans to bury Britain's nuclear waste]

Creators

Description

UK Nirex is about to issue its revised conclusions on its favoured site for a waste repository that will contain the nation's low-level and intermediate-level radioactive waste. The original conclusions, concentrating on the geology at Sellafield, Cumbria, and the likely movement of groundwater passing through the site about 800m underground, were widely rubbished. Nirex says it will have to delay its planning application for the repository until autumn 1993. It is unsure of its ability to present a convincing case for groundwater flows in the future. The National Radiological Protection Board is assessing the risk over the next 10 000 years. Longer than that is meaningless it says. (Author)

Additional details

Additional titles

Augmented title (English)
Planning difficulties over proposed Sellafield repository

Publishing Information

Journal Title
Engineer (London)
Journal Volume
275
Journal Issue
7110
Journal Page Range
p. 25.
ISSN
0013-7758
CODEN
ENGIAL