Published April 15, 1993 | Version v1
Journal article

Initial commissioning of the HV electrostatic generator for the Vivitron project

  • 1. Centre de Recherches Nucleaires, IN2P3-CNRS, Univ. Louis Pasteur, 67 - Strasbourg (France)

Description

Soon after the complete assembly of the Vivitron as an electrostatic generator at the end of October 1990, initial commissioning began. Voltage tests were carried out at 7 bar SF6 from December 1990 to March 1991. An intermediate level of 17.6 MV was reached but with high parasitic currents from the rollers in the dead sections and with flashovers along the column and related damage to the insulating plates. A high level of humidity, which was diagnosed at a later stage, was the cause of those difficulties. In addition, major problems connected with the gas handling system stopped the tests for the rest of the year and up to the end of March 1992 when the generator was made ready for tests after carrying out repairs and cleaning which were completed by the end of January and then implementing some improvements and reassembly. A very encouraging level of 18.9 MV at 4 bar half pressure was reached in April, but this has not been reproduced since then due to various problems and damage from sparking. (orig.)

Additional details

Publishing Information

Journal Title
Nuclear Instruments and Methods in Physics Research. Section A
Journal Volume
328
Journal Issue
1/2
Journal Page Range
p. 76-79.
ISSN
0168-9002
CODEN
NIMAER

Conference

Title
6. international conference on electrostatic accelerators and associated boosters (EAAB-6).
Dates
1-5 Jun 1992.
Place
Padua (Italy).

Optional Information

Collaborations
Vivitron Group.