Published November 18, 1998 | Version v1
Report Open

Safety analysis report for packaging upgrade plan

Description

This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A Project Hanford Management Contract (PHMC) Performance Expectation exists to update, revise, and/or cancel seven onsite SARPS during FY 1999. It is the U.S. Department of Energy's desire that 100% of the SARPs (which existed at the beginning of the PHMC Contract) be upgraded, revised, and/or canceled by the end of the five year contract. This plan is a ''living'' document and is used as a management tool

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00011278; PURL: https://www.osti.gov/servlets/purl/11278-UheGnE/webviewable/

Files

33000797.pdf

Files (304.9 kB)

Name Size Download all
md5:e7de2480375c7d7b49f1e1e336a7747f
304.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
14 p.
Report number
HNF--SD-TP-PLN-006(Rev.6)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33000797
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
Descriptors DEI
MODIFICATIONS; PACKAGING; PERFORMANCE; RADIOACTIVE MATERIALS; SAFETY ANALYSIS; SCHEDULES
Descriptors DEC
MATERIALS

Optional Information

Contract/Grant/Project number
AC06-96RL13200
Funding organization
US DOE Office of Environmental Management (United States)
Secondary number(s)
EW--7070601