Published November 29, 1977
| Version v1
Report
Restricted
Electrical single failure analysis of LOFT 50 ton polar crane, 10 ton auxiliary hoist, and 4000 lb supplemental hoist
Description
The report analyzes the single failures that could occur in the electrical drives of the LOFT 50 Ton Polar Crane, 10 Ton Auxiliary Hoist and 4000 lb Supplemental Hoist. A component failure analysis is provided for all functional subassemblies in the electrical control system. Failures resulting in adverse motor performance were assigned three consequence levels, and three failure probabilities, and were included in a fault tree analysis. Recommendations are made to reduce the consequences of the drive failures. Unusual firing of Trolley Drive Generator Field SCR's was investigated and a recommendation to eliminate the problem is made
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A05/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 96 p.
- Report number
- LTR--1317-3
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9389740
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CRANES; ELECTRIC CONTROLLERS; ELECTRIC MOTORS; ELECTRICAL EQUIPMENT; FAILURE MODE ANALYSIS; FAILURES; LOFT REACTOR; MATERIALS HANDLING
- Descriptors DEC
- CONTROL EQUIPMENT; MOTORS; PWR TYPE REACTORS; REACTORS; RESEARCH AND TEST REACTORS; SYSTEM FAILURE ANALYSIS; SYSTEMS ANALYSIS; TANK TYPE REACTORS; TEST REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS