Published June 2003 | Version v1
Report Open

Utilization of the capsule out-pile test facilities(2000-2003)

Description

Two out-pile test facilities were installed and being utilized for the non-irradiation tests outside the HANARO. The names of the facilities are the irradiation equipment design verification test facilities and the one-channel flow test device. In these facilities, the performance test of all capsules manufactured before loading in the HANARO and the design verification test for newly developed capsules were performed. The tests in these facilities include loading/unloading, pressure drop, endurance and vibration test etc. of capsules. In the period 2000∼2003, the performance tests for 8 material capsules of 99M-01K∼02M-05U were carried out, and the design verification tests of creep and fuel capsules developed newly were performed. For development of the creep capsule, pressure drop measurement, operation test of heater, T/C, LVDT and stress loading test were performed. In the design stage of the fuel capsule, the endurance and vibration test besides the above mentioned tests were carried out for verification of the safe operation during irradiation test in the HANARO. And in-chimeny bracket and the capsule supporting system were fixed and the flow tubes and the handling tools were manufactured for use at the facilities

Availability note (English)

Available from INIS in electronic form; Also available from KAERI

Files

37024456.pdf

Files (1.6 MB)

Name Size Download all
md5:1ee84e21dd360452ea9010d81baf6618
1.6 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
42 p.
Report number
KAERI/TR--2406/2003

Optional Information

Notes
7 refs, 20 figs, 11 tabs