Published June 13, 1976
| Version v1
Report
Restricted
Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)
Description
The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 49 p.
- Report number
- TID--27299
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 8312978
- Subject category
- S07: ISOTOPES AND RADIATION SOURCES;
- Descriptors DEI
- BRAYTON CYCLE; PERFORMANCE TESTING; POWER GENERATION; RADIOISOTOPE HEAT SOURCES; SPACECRAFT POWER SUPPLIES
- Descriptors DEC
- ELECTRONIC EQUIPMENT; ENERGY SOURCES; POWER SUPPLIES; TESTING; THERMODYNAMIC CYCLES
Optional Information
- Notes
- Available from NTIS. $4.00.