Published 2008 | Version v1
Book

Fuel cycle options and sustainability for new nuclear build in the UK

Description

After a long period of stagnation in the UK, Europe and the USA, there is now a real expectation that new nuclear plants will be under construction shortly. Several factors have contributed to this change of position in the UK: the growing realisation that effective action is needed to offset greenhouse gas emissions; higher prices for fossil fuels; increasing reliance on overseas supplies of oil and gas; the limitations of wind and wave power and distribution; security of supply; the gradual realisation in the deregulated electricity generation market that nuclear power is competitive and the pending closure of most of the UK's nuclear fleet within less than 15 years. All these factors have led to a reversal of the UK Government's attitude to nuclear power, which has now ruled in favour of allowing a new generation of nuclear plants being built. This paper summarises some of the arguments that have led to this decision and the ramifications of it. In particular, the potential of the New Build reactor to re-use the UK's stocks of separated plutonium and reprocessed uranium (Rep U) is considered in detail. (authors)

Additional details

Publishing Information

Publisher
Paul Scherrer Institut - PSI
Imprint Place
Villigen PSI (Switzerland)
ISBN
978-3-9521409-5-6
Imprint Pagination
8 p.

Conference

Title
International Conference on the Physics of Reactors 'Nuclear Power: A Sustainable Resource'
Acronym
PHYSOR'08
Dates
14-19 Sep 2008
Place
Interlaken (Switzerland)

Optional Information

Notes
8 refs.; proceedings are available as a CD-ROM on request to info'at'physor08.ch