Published February 28, 1977
| Version v1
Report
Restricted
Palisades Nuclear Plant. Annual operating report: January--December 1976
Description
Net electrical power generated was 2,847,033 MWH with the reactor on line 4,850.4 hrs. Information is presented concerning operations, corrective maintenance, eddy current steam generator testing, inservice inspection, containment leak testing, fuel sipping, power generation, shutdowns, and occupational radiation exposures
Availability note (English)
MF available from INIS under the Report Number; USERDA-TIC.
Files
Additional details
Publishing Information
- Imprint Pagination
- 77 p.
- Report number
- DOCKET-50255--951
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 8328641
- Subject category
- S99: GENERAL AND MISCELLANEOUS;
- Descriptors DEI
- CONTAINMENT; EDDY CURRENT TESTING; FAILED ELEMENT DETECTION; IN-SERVICE INSPECTION; LEAK TESTING; PALISADES-1 REACTOR; PERFORMANCE; PERSONNEL; POWER GENERATION; RADIATION DOSES; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SHUTDOWN; STEAM GENERATORS; TUBES; TURBOGENERATORS
- Descriptors DEC
- BOILERS; ELECTRIC GENERATORS; ELECTROMAGNETIC TESTING; ENRICHED URANIUM REACTORS; INSPECTION; MAINTENANCE; MATERIALS TESTING; NONDESTRUCTIVE TESTING; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTORS; TESTING; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS