Published November 2004 | Version v1
Miscellaneous Open

Bohunice - information within October 2004

Description

In this leaflet results of exploitation of four units of the Bohunice V-1 and V-2 NPPs are presented. The electricity and heat production in October 2004 are reviewed. Within a October 2004 the electricity was produced: 290 GWh (block 1), 247 GWh (block 2), 294 GWh (block 3), 295 GWh (block 4), totally 1126 GWh, and 9209 GWh within a January - October 2004. The heat production in October 2004 was 112 922 GJ, and within a January - October 2004 it was produced 1 122 847 GJ of heat

Availability note (English)

Available from INIS in electronic form; Also available: English translation can be ordered from the Omega Info, Vysehradska 33, 85106 Bratislava, Slovak Republic (e-mail: info@omegainfo.sk), at USD 10.00 per standard page (1800 characters)

Files

36090456.pdf

Files (137.1 kB)

Name Size Download all
md5:7909d3c8a0a52b8ae507683220ccaef3
137.1 kB Preview Download

Additional details

Additional titles

Original title (Slovak)
Bohunice - informacie za oktober 2004

Publishing Information

Publisher
Atomove elektrarne Bohunice
Imprint Place
Jaslovske Bohunice (Slovakia)
Imprint Pagination
2 p.
Report number
INIS-SK--2005-014

Optional Information

Notes
1 fig., 1 tab.