Published 1994 | Version v1
Report Open

Test Procedure - pumping system for caustic addition project

Description

This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95000463; NTIS; US Govt. Printing Office Dep.

Files

26022169.pdf

Files (1.5 MB)

Name Size Download all
md5:0207ee1c26fb1cecae8e93fe33f341e9
1.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
61 p.
Report number
WHC-SD-WM-TC--062

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).