RA reactor operation, Annex A

  • 1. Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia)

Description

RA reactor was not operated during 1992 because of the complete instrumentation exchange. Although it has been planned to exchange the complete instrumentation until the end of 1992, and to start reactor operation in the first half of 1993. This was not fulfilled because the instrumentation was not delivered until the end of 1992. Since our country is under international sanctions it is not possible to plan when the instrumentation will be delivered and foresee the precise date of reactor start-up. That is why this annex includes the plan of reactor operation for period of nine months starting from from the moment of start-up. It is planned to operate the reactor at 0.02 MW power first three months, to increase the power gradually and reach 3.5 MW after 8 months of operation. It is foreseen to operate the reactor at 4.7 MW from the tenth month on

Abstract (Serbian)

U 1992. godini reaktor nije bio u pogonu zbog zamene njegove celokupne instrumentacije. Iako je bilo planirano da se celokupna instrumentacija zameni do kraja 1992. te da reaktor pocne sa radom u prvoj polovini 1993. Ovo nije ispunjeno jer celokupna oprema nije isporucena ni do kraja 1992. godine. Zbog medjunarodne blokade nase zemlje neizvesno je kada ce oprema biti isporucena i tacan datum pocetka rada reaktora RA ne moze da se odredi. Zato ovaj prilog sadrzi plan rada za 9 meseci od momenta starta. Predvidja se da reaktor radi na snazi od 0,02 MW prva tri meseca, da se snaga postepeno podize i dostigne vrednost od 3,5MW nakon 8 meseci rada. Predvidja se da reaktor radi na snazi od 4,7 MW od desetog meseca nadalje

Files

41123814.pdf

Files (42.9 kB)

Name Size Download all
md5:eec514661b0cf56c3af69c3069bb0291
42.9 kB Preview Download
Part of:
Research nuclear reactor RA - Annual report 1992

Additional details

Additional titles

Original title (Serbian)
Eksploatacija reaktora RA - prilog A

Publishing Information

Imprint Place
Beograd-Vinca (Serbia)
Imprint Title
Research nuclear reactor RA - Annual report 1992
Imprint Pagination
287 p.
Journal Page Range
3 p.
Report number
INIS-CS--0022

Optional Information

Notes
1 tabs; This record replaces 37024347 Imprint:Istrazivacki nuklearni reaktor RA - Izvestaj za 1992. godinu
Secondary number(s)
RA--103/R1/P2/15/02