Published 2004 | Version v1
Report Open

Safety analysis performed in support of the Wolf Creek uprating program

  • 1. Wolf Creek Nuclear Operation Corp., Wichita, KS (United States)
  • 2. ERIN Engineering and Research Inc., Walnut Creek, CA (United States)

Description

Wolf Creek Nuclear Operation Corporation (WCNOC) has recently completed a plant uprating program which is to take effect during cycle 7 (in November, 1993). In this program the major plant change was to increase the plant reactor power from 3411·106 Wt to 3565·106 Wt, a 4.5% increase. In addition, several other changes were made as a result of switching to VANTAGE 5H fuel with intermediate flow mixers. These included 1) a positive moderator temperature coefficient, 2) a decrease in thermal design flow, 3) an increase in main steam safety valve blowdown capacities, 4) a Loss of Coolant Accident (LOCA) re-analysis, 5) a FΔH/FQ increase, 6) a thimble plug removal, 7) an increase in allowable steam generator tube plugging, and 8) a core operating limit report. (author)

Files

35097912.pdf

Files (262.5 kB)

Name Size Download all
md5:2a5dbd5069230b53ac3b000942ecf605
262.5 kB Preview Download
Part of:
Proceedings of the fourth international topical meeting on nuclear thermal hydraulics, operations and safety. Vol. 2

Additional details

Publishing Information

Imprint Title
Proceedings of the fourth international topical meeting on nuclear thermal hydraulics, operations and safety. Vol. 2
Imprint Pagination
814 p.
Journal Page Range
p. 46C1-46C4
Report number
INIS-XA-N--081

Conference

Title
4. international topical meeting on nuclear thermal hydraulics, operations and safety
Dates
5-8 Apr 1994
Place
Taipei, Taiwan (China)

Optional Information

Notes
This record replaces 35095645; 1 ref., 7 tabs