Published 1980 | Version v1
Report Restricted

Design and construction of the Tritium Systems Test Assembly

Description

The objective of TSTA is to develop those aspects of tritium technology related to the fuel cycle for fusion power reactors and to develop the environmental and personnel safety systems required for such a tritium facility. The TSTA schedule calls for construction to be completed and the facility to be operational by the end of FY-1981. The project is now somewhat more than halfway through the design-construction phase and is currently on schedule for the 1981 operational milestone. In this paper the current status of the major subsystems will be discussed. The subsystems to be discussed include the: Vacuum Facility; Fuel Cleanup; Isotope Separation; Transfer Pump; Emergency Tritium Cleanup; Tritium Waste Treatment; Tritium Monitoring; Secondary Containment; and, the Master Data Acquisition and Control System

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
LA-UR--80-1203

Conference

Title
Tritium technology in fission, fusion, and isotopic application.
Dates
29 Apr - 1 May 1980.
Place
Dayton, OH, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
11550273
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CONSTRUCTION; CONTAINMENT; DATA ACQUISITION SYSTEMS; MONITORING; REVIEWS; SPECIFICATIONS; TRITIUM; TRITIUM RECOVERY
Descriptors DEC
BETA DECAY RADIOISOTOPES; BETA-MINUS DECAY RADIOISOTOPES; DOCUMENT TYPES; HYDROGEN ISOTOPES; ISOTOPES; LIGHT NUCLEI; NUCLEI; ODD-EVEN NUCLEI; RADIOISOTOPES; YEARS LIVING RADIOISOTOPES

Optional Information

Secondary number(s)
CONF-800427--6.