Design and construction of the Tritium Systems Test Assembly
Description
The objective of TSTA is to develop those aspects of tritium technology related to the fuel cycle for fusion power reactors and to develop the environmental and personnel safety systems required for such a tritium facility. The TSTA schedule calls for construction to be completed and the facility to be operational by the end of FY-1981. The project is now somewhat more than halfway through the design-construction phase and is currently on schedule for the 1981 operational milestone. In this paper the current status of the major subsystems will be discussed. The subsystems to be discussed include the: Vacuum Facility; Fuel Cleanup; Isotope Separation; Transfer Pump; Emergency Tritium Cleanup; Tritium Waste Treatment; Tritium Monitoring; Secondary Containment; and, the Master Data Acquisition and Control System
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 7 p.
- Report number
- LA-UR--80-1203
Conference
- Title
- Tritium technology in fission, fusion, and isotopic application.
- Dates
- 29 Apr - 1 May 1980.
- Place
- Dayton, OH, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 11550273
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; CONTAINMENT; DATA ACQUISITION SYSTEMS; MONITORING; REVIEWS; SPECIFICATIONS; TRITIUM; TRITIUM RECOVERY
- Descriptors DEC
- BETA DECAY RADIOISOTOPES; BETA-MINUS DECAY RADIOISOTOPES; DOCUMENT TYPES; HYDROGEN ISOTOPES; ISOTOPES; LIGHT NUCLEI; NUCLEI; ODD-EVEN NUCLEI; RADIOISOTOPES; YEARS LIVING RADIOISOTOPES
Optional Information
- Secondary number(s)
- CONF-800427--6.