Senagal National Presentation on Nuclear Power Infrastructure
Description
Regulatory Body (RB) implementation is in progress: decree defining Role, Responsibility and Mission of RB signed after IAEA Advisory Mission received 7-11 December 2009. Self-assessment on some topics of the Milestones will be done by Working Group (WG). The political statement from government Declaration of indentation to consider nuclear energy generation was read at IAEA General Conference). Decree 2008-1433 (December -12- 2008d) creates under the authority of the President de la République a Work Group for the Management and the realization of the Senegalese Nuclear Power Project in the horizon 2016. The Draft Law in preparation and the laws on Radiation protection and Nuclear Safety (law 2004-17 and law 2009-14) provide for a Regulatory Body but ASRN is not yet fully established by decrees although the decree 2010-893 July 30 2010 defining the role and missions of ASRN has been signed by President
Files
47114959.pdf
Files
(4.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:ba2c03e86f14238b7f105f1a36a49860
|
4.3 MB | Preview Download |
Additional details
Publishing Information
- Imprint Title
- Establishing Self-Assessment Mechanisms and Capacities (INIR Approach)
- Imprint Pagination
- [502 p.]
- Journal Page Range
- 16 p.
- Report number
- INIS-KE--009
Conference
- Title
- Regional Workshop on Preparation of a National Nuclear Power Infrastructure Evaluation
- Dates
- 23-27 Aug 2010
- Place
- Mombasa (Kenya)
INIS
- Country of Publication
- Kenya
- Country of Input or Organization
- Kenya
- INIS RN
- 47114959
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- IAEA; IMPLEMENTATION; LAWS; MANAGEMENT; NUCLEAR ENERGY; NUCLEAR POWER; RADIATION PROTECTION
- Descriptors DEC
- ENERGY; INTERNATIONAL ORGANIZATIONS; POWER
Optional Information
- Notes
- 1 figs.