Published July 5, 2004 | Version v1
Report

CONSTRUCTION STATUS AND ISSUES OF THE SPALLATION NEUTRON SOURCE RING

Description

The Spallation Neutron Source (SNS) ring is designed to accumulate beam pulses of 1.5 x 1014 protons of 1 GeV kinetic energy at a repetition rate of 60 Hz [1]. At such beam intensity and power, key design challenges include control of beam loss and radio-activation, construction of high-quality large-aperture magnets and power supplies, design of robust injection and extraction systems, minimization of beam-coupling impedances, and mitigation of electron-cloud effects. This paper discusses the status of the ring systems with emphasis on technical challenges and issues, and presents future perspectives towards a next-generation high-intensity facility

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/15007973-PX3R3g/native/

Additional details

Publishing Information

Imprint Pagination
4 p.
Report number
BNL--71988-2004-CP

Conference

Title
9. European Particle Accelerator Conference (EPAC-04)
Dates
5-9 Jul 2004
Place
Lucerne (Switzerland)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
35076840
Subject category
S07: ISOTOPES AND RADIATION SOURCES; S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; CONSTRUCTION; DESIGN; KINETIC ENERGY; MAGNETS; MINIMIZATION; MITIGATION; NEUTRON SOURCES; POWER SUPPLIES; PROTONS; SPALLATION
Descriptors DEC
BARYONS; ELECTRONIC EQUIPMENT; ELEMENTARY PARTICLES; ENERGY; EQUIPMENT; FERMIONS; HADRONS; NUCLEAR REACTIONS; NUCLEONS; OPTIMIZATION; PARTICLE SOURCES; RADIATION SOURCES

Optional Information

Contract/Grant/Project number
39KC0200; AC02-98CH10886
Funding organization
DOE/OFFICE OF SCIENCE (United States)