Published February 28, 2000
| Version v1
Report
Restricted
Operational Test Report (OTR) for U-105 Pumping and Instrumentation and Control (PIC) Skid
Creators
Description
Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-18). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-105. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998)
Availability note (English)
Available from INIS in electronic form; Also available from OSTI as DE00801329; PURL: https://www.osti.gov/servlets/purl/801329-L85zcw/webviewable/
Files
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 213 p.
- Report number
- HNF--5838
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 34016201
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- COMPUTERIZED CONTROL SYSTEMS; MEASURING INSTRUMENTS; MONITORS; PERFORMANCE TESTING; PUMPING; PUMPS; STORAGE FACILITIES; WASTE RETRIEVAL
- Descriptors DEC
- CONTROL SYSTEMS; EQUIPMENT; MANAGEMENT; MEASURING INSTRUMENTS; ON-LINE CONTROL SYSTEMS; ON-LINE SYSTEMS; TESTING; WASTE MANAGEMENT
Optional Information
- Contract/Grant/Project number
- EDT-618011; AC06-96RL13200
- Funding organization
- ENVIRONMENTAL MANAGEMENT (United States)