THTR operating experience

  • 1. Vereinigte Elektrizitaetswerke Westfalen A.G. (VEW), Dortmund (Germany, F.R.)

Description

THTR was constructed mainly from 1971 to 1974 and again from 1982 to 1985. In between, there has been nearly a standstill due to a sequence of new licensing requirements. In September 1982 the prestressed concrete reactor vessel was pressure and leak tested. First criticality was reached in September 1983 and first current was sent out in November 1985. In September 1986 the plant achieved full power. After completion of the ample test phase and the final contractual trial run THTR was handed over to the owner in June 1987. Operation has been quite successful: Prototypical components behave well with a few, non-generic exceptions. Compliance of measurements and calculations, load following capabilities, and fission product retention are very good, personnel dose is low. (orig.)

Additional details

Publishing Information

Journal Title
Nuclear Engineering and Design
Journal Volume
109
Journal Issue
1/2
Series
Nucl. Eng. Des.
Journal Page Range
199-205
ISSN
0029-5493
CODEN
NEDEA

Conference

Title
Design, safety and marketing potential.
Acronym
Seminar on small and medium sized nuclear reactors
Dates
24-26 Aug 1987.
Place
Lausanne (Switzerland).