Operating experience with TFTR's Tritium Storage and Delivery System

  • 1. Princeton Plasma Physics Lab., NJ (United States)

Description

The Tritium Storage and Delivery System (TSDS) at TFTR was fabricated at Monsanto Mound Lab in the late 1970's and delivered to PPPL in the early 1980's. Commissioning progressed slowly and was finally completed in 1992 following a series of Preoperational tests and Integrated Systems tests. Those tests included thorough leak testing of glove boxes and process piping, electrical interlocks and controls, instrumentation calibrations, volume determinations and verification of uranium bed capacity. The system accepted tritium in dilute form in May of 1993 and began serious usage of pure tritium in November 1993. As the throughput of high purity tritium increased, shortcomings of the system became evident and extensive repairs were implemented. System leakage and material compatibility were the primary causes of the problems. To date, the system has received, stored and delivered over 500 kCi of tritium and is performing very well. The dedicated quadrupole mass spectrometer and beta scintillator system has been analyzing tritium bearing and pure gas streams for over 3 years with minimal downtime

Additional details

Publishing Information

Publisher
Institute of Electrical and Electronics Engineers, Inc.
Imprint Place
Piscataway, NJ (United States)
ISBN
0-7803-2970-8
Imprint Title
1995 IEEE 16. symposium on fusion engineering. Volume 1
Imprint Pagination
886 p.
Journal Page Range
p. 600-603.

Conference

Title
16. IEEE/NPSS symposium on fusion engineering - seeking a new energy ERA (Sofe 95).
Dates
1-5 Oct 1995.
Place
Champaign, IL (United States).

INIS

Optional Information

Contract/Grant/Project number
Contract AC02-76CH03073
Funding organization
USDOE, Washington, DC (United States).