Published May 2012 | Version v1
Report Restricted

Improvement of risk informed surveillance test interval for the safety related instrument and control system of Ulchin units 3 and 4

Description

The purpose of this research is the development of various methodologies necessary for the licensing of the risk informed surveillance test interval(STI) improvement for the safety related I and C systems in UCN 3 and 4, for instance, reactor protection system (RPS), engineered safety features actuation system (ESFAS), ESF auxiliary relay cabinet (ARC), and core protection calculator (CPC). The technical adequacy of the methodology was sufficiently verified through the application to the following STI changes. o CPC channel functional test (change from 1 month to 3 months including safety channel and log power test) o RPS channel functional test (change from 1 month to 3 months) o RPS logic and trip channel test (change from 1 month to 3 months. 1 month for RPS manual actuation test) o ESFAS channel functional test (change from 1 month to 3 months) o ESFAS logic and trip channel test (change from 1 month to 3 months) o ESF auxiliary relay test (change from 1 month to 3 months with staggered test. Manual actuation at the ESF ARC is added as a backup of ESF actuation signals during emergency operation

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
261 p.
Report number
KAERI/TR--4558/2012

Optional Information

Notes
122 refs, 75 figs, 98 tabs