Improvement of risk informed surveillance test interval for the safety related instrument and control system of Ulchin units 3 and 4
Description
The purpose of this research is the development of various methodologies necessary for the licensing of the risk informed surveillance test interval(STI) improvement for the safety related I and C systems in UCN 3 and 4, for instance, reactor protection system (RPS), engineered safety features actuation system (ESFAS), ESF auxiliary relay cabinet (ARC), and core protection calculator (CPC). The technical adequacy of the methodology was sufficiently verified through the application to the following STI changes. o CPC channel functional test (change from 1 month to 3 months including safety channel and log power test) o RPS channel functional test (change from 1 month to 3 months) o RPS logic and trip channel test (change from 1 month to 3 months. 1 month for RPS manual actuation test) o ESFAS channel functional test (change from 1 month to 3 months) o ESFAS logic and trip channel test (change from 1 month to 3 months) o ESF auxiliary relay test (change from 1 month to 3 months with staggered test. Manual actuation at the ESF ARC is added as a backup of ESF actuation signals during emergency operation
Files
Additional details
Publishing Information
- Imprint Pagination
- 261 p.
- Report number
- KAERI/TR--4558/2012
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 44122994
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CONTROL SYSTEMS; HAZARDS; REACTOR PROTECTION SYSTEMS; SAFETY; SIGNALS; ULCHIN-3 REACTOR; ULCHIN-4 REACTOR
- Descriptors DEC
- ENGINEERED SAFETY SYSTEMS; ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 122 refs, 75 figs, 98 tabs