Published April 15, 1983 | Version v1
Journal article

Present status of the photon factory

  • 1. National Lab. for High Energy Physics, Oho, Ibaraki (Japan)

Description

The Photon Factory project was initiated in 1978, Construction of the 2.5 GeV electron linac and the 2.5 GeV electron storage ring were completed in March 1982. Immediately after the first success of storage of electrons in the ring in March 1982, preliminary experiments were made using synchrotron radiation; also test experiments were made in the second run of June-July 1982, using more than fifteen experimental apparatuses constructed and prepared. These apparatuses and some others under preparation will be in full use from April 1983. (orig.)

Additional details

Publishing Information

Journal Title
Nucl. Instrum. Methods Phys. Res.
Journal Volume
208
Journal Issue
1-3
Series
Nucl. Instrum. Methods Phys. Res.
Journal Page Range
23-30
ISSN
0029-554X

Conference

Title
International conference on X-Ray and VUV synchrotron radiation instrumentation.
Dates
9-13 Aug 1982.
Place
Hamburg (Germany, F.R.).

INIS

Country of Publication
Netherlands
Country of Input or Organization
Netherlands
INIS RN
14796203
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM OPTICS; BEAM TRANSPORT; ELECTRON BEAMS; GEV RANGE 01-10; LINEAR ACCELERATORS; PERFORMANCE TESTING; PHOTON BEAMS; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION
Descriptors DEC
ACCELERATORS; BEAMS; BREMSSTRAHLUNG; ELECTROMAGNETIC RADIATION; ENERGY RANGE; GEV RANGE; LEPTON BEAMS; PARTICLE BEAMS; RADIATIONS; TESTING