Published June 1979 | Version v1
Report Restricted

Estimation of inspection effort

Description

An overview of IAEA inspection activities is presented, and the problem of evaluating the effectiveness of an inspection is discussed. Two models are described - an effort model and an effectiveness model. The effort model breaks the IAEA's inspection effort into components; the amount of effort required for each component is estimated; and the total effort is determined by summing the effort for each component. The effectiveness model quantifies the effectiveness of inspections in terms of probabilities of detection and quantities of material to be detected, if diverted over a specific period. The method is applied to a 200 metric ton per year low-enriched uranium fuel fabrication facility. A description of the model plant is presented, a safeguards approach is outlined, and sampling plans are calculated. The required inspection effort is estimated and the results are compared to IAEA estimates. Some other applications of the method are discussed briefly. Examples are presented which demonstrate how the method might be useful in formulating guidelines for inspection planning and in establishing technical criteria for safeguards implementation

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A05/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
80 p.
Report number
PNL--2558

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
11518651
Subject category
S98: NUCLEAR DISARMAMENT, SAFEGUARDS AND PHYSICAL PROTECTION;
Descriptors DEI
FUEL FABRICATION PLANTS; IAEA SAFEGUARDS; INSPECTION; PERSONNEL; SLIGHTLY ENRICHED URANIUM
Descriptors DEC
ACTINIDES; ELEMENTS; ENRICHED URANIUM; ISOTOPE ENRICHED MATERIALS; METALS; NUCLEAR FACILITIES; SAFEGUARDS; URANIUM

Optional Information

Secondary number(s)
ISPO--35.