Published September 24, 1998 | Version v1
Report Open

TWRS phase 1 infrastructure project (W-519) characterization

Description

In order to treat the mixed radioactive and hazardous waste stored in 177 underground tanks, the Tank Waste Remediation System (TWRS) program is developing a 'demonstration' site for treatment and immobilization of these wastes by a private contractor. Project W-519 is providing the infrastructure support to this site by developing the designs and emplacing required pipelines, roads, electrical, etc. In support of the TWRS Phase 1 Infrastructure Project (W-519) Characterization, Numatec Hanford Corporation (NHC) contracted with Waste Management Federal Services, Inc., Northwest Operations (WMNW) to investigate a number of locations in and just outside the 200 East Area eastern fenceline boundary. These areas consisted of known or suspected waste lines or waste sites that could potentially impact the construction and emplacement of the proposed facility improvements, including waterlines and roads. These sites were all located subsurface and sugaring would be required to obtain sample material from the desired depth. The soils would then be sampled and submitted to the laboratory for analysis of radioactivity

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050775; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

30060139.pdf

Files (1.5 MB)

Name Size Download all
md5:738b2458377a6559487a5adafedd113e
1.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
84 p.
Report number
HNF--3210