Published 1900 | Version v1
Report Restricted

Inspector measurement verification activities

Description

e most difficult and complex activity facing a safeguards inspector involves the verification of measurements and the performance of the measurement system. Remeasurement is the key to measurement verification activities. Remeasurerements using the facility's measurement system provide the bulk of the data needed for determining the performance of the measurement system. Remeasurements by reference laboratories are also important for evaluation of the measurement system and determination of systematic errors. The use of these measurement verification activities in conjunction with accepted inventory verification practices provides a better basis for accepting or rejecting an inventory. (U.S.)

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
p.75.
Report number
ALO--3

Conference

Title
Annual meeting of the institute of nuclear materials management.
Dates
18 Jun 1975.
Place
New Orleans, Louisiana, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
6207351
Subject category
S98: NUCLEAR DISARMAMENT, SAFEGUARDS AND PHYSICAL PROTECTION;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ACCOUNTING; ERRORS; INSPECTION; INVENTORIES; MATERIAL BALANCE; MEASURING INSTRUMENTS; MEASURING METHODS; NUCLEAR MATERIALS MANAGEMENT; PERFORMANCE; SAFEGUARDS
Descriptors DEC
MANAGEMENT

Optional Information

Secondary number(s)
NF-750608--1 r.