Published 1993 | Version v1
Miscellaneous

Thirty years experience in ETRR-1 operation

Creators

Description

Egypt research reactor (ET-R R-1) got critical in 27. July 1961. since that time many technical problems in system manipulation were raised. The present paper demonstrates the famous events that were initiated and the procedures that were taken for their recovery or mitigation. Maintenance problems are discussed. Reactor parameters measuring systems and control have been modernized. The reactor is investigated by in-service inspection program,. The results that reactor vessels surface conditions are in good status. Experience obtained from these activities and some proposals for future development are summarized.6 fig., 1 tab

Part of:
Proceedings of the symposium on the physics and technology of reactors

Additional details

Publishing Information

Imprint Title
Proceedings of the symposium on the physics and technology of reactors
Imprint Pagination
766 p.
Journal Page Range
p. 629-647.
Report number
INIS-mf--14313

Conference

Title
Symposium on physics and technology of nuclear reactors.
Dates
11-16 Sep 1993.
Place
Cairo (Egypt).

Optional Information