Published January 1992 | Version v1
Report

A case history of the 1A1 RCP event on July 2, 1990

  • 1. Florida Power and Light, Ft. Pierce (United States)

Description

This paper describes the event and the resulting investigation of the shut down of the 1A1 reactor coolant pump of St. Lucie Unit number-sign 1. The topics of the paper are a list of events leading up to the pump shutdown, the mechanical vibration history of the pump, the loose parts monitor data analysis and evaluation results, radiation exposure for the repair of the pump, and water temperature versus pump thrust position data. This paper consists of overheads from the presentation

Additional details

Publishing Information

Imprint Title
Proceedings: Main coolant pump workshop, 1991
Imprint Pagination
557 p.
Journal Page Range
p. 18.1-18.9.
Report number
EPRI-TR--100299

Conference

Title
Main coolant pump workshop -- 1991.
Dates
16-18 Apr 1991.
Place
Phoenix, AZ (United States).

Optional Information

Secondary number(s)
CONF-9104332--.