Published September 1978 | Version v1
Report Restricted

Pool-type LMFBR plant 1000 MWe Phase A-Extension-1 design. Part II. Reactor assembly: structures. Sections 7-11. Interim report

Description

The Phase A effort produced an initial description of the overall plant, structures and systems. During Phase A, General Electric developed the overall nuclear steam supply system (NSSS) conceptual design. It defined specific design approaches for selected NSSS components and subsystems after analyzing various design alternatives. Bechtel assumed responsibility for the intermediate sodium piping arrangement, the access area above the reactor deck and the Balance of Plant (BOP). The resulting integrated plant design provided the necessary seismic data for both the NSSS and BOP

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A11/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
245 p.
Report number
EPRI-NP--882(Vol.2B)

INIS