Brief analysis of priority assembly construction method for stainless steel liner
Description
In order to reduce the field construction workload of stainless liner and effectively shorten the construction period of the entire project, shop pre-fabrication (per blocks, sections) and field assembly method is adopted in the construction of stainless steel liner, which effectively shorten the necessary operation time in the critical path of the entire civil project construction, and speed up the construction progress of the critical path. The priority assembly construction method of stainless steel liner can be further spread out. (author)
Additional details
Publishing Information
- Journal Title
- China Nuclear Power
- Journal Volume
- 4
- Journal Issue
- 2
- Journal Page Range
- p. 125-129
- ISSN
- 1674-1617
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 45059087
- Subject category
- S42: ENGINEERING;
- Descriptors DEI
- CONSTRUCTION; FABRICATION; LINERS; NUCLEAR FACILITIES; OPERATION; STAINLESS STEELS
- Descriptors DEC
- ALLOYS; CARBON ADDITIONS; HIGH ALLOY STEELS; IRON ALLOYS; IRON BASE ALLOYS; STEELS; TRANSITION ELEMENT ALLOYS
Optional Information
- Notes
- 5 figs.