Brief analysis of priority assembly construction method for stainless steel liner

Creators

  • 1. China Nuclear Industry 22nd Construction Co., Ltd, Haiyan (China)

Description

In order to reduce the field construction workload of stainless liner and effectively shorten the construction period of the entire project, shop pre-fabrication (per blocks, sections) and field assembly method is adopted in the construction of stainless steel liner, which effectively shorten the necessary operation time in the critical path of the entire civil project construction, and speed up the construction progress of the critical path. The priority assembly construction method of stainless steel liner can be further spread out. (author)

Additional details

Publishing Information

Journal Title
China Nuclear Power
Journal Volume
4
Journal Issue
2
Journal Page Range
p. 125-129
ISSN
1674-1617

INIS

Country of Publication
China
Country of Input or Organization
China
INIS RN
45059087
Subject category
S42: ENGINEERING;
Descriptors DEI
CONSTRUCTION; FABRICATION; LINERS; NUCLEAR FACILITIES; OPERATION; STAINLESS STEELS
Descriptors DEC
ALLOYS; CARBON ADDITIONS; HIGH ALLOY STEELS; IRON ALLOYS; IRON BASE ALLOYS; STEELS; TRANSITION ELEMENT ALLOYS

Optional Information

Notes
5 figs.