Published July 15, 1993 | Version v1
Report Restricted

The partial snake experiment at the AGS. Progress report, 15 August 1992--14 August 1994

Description

In the two year funding period from August 15, 1992--August 14, 1994, the authors progresses can be summarized as follows: (1) the solenoidal partial snake was installed in the AGS synchrotron in May, 1993 and was subsequently successfully tested; (2) the internal polarimeter for the AGS was assembled, tested and installed in the AGS; (3) the 200 MeV polarimeter at the LINAC was tested; (4) the AGS polarized ion source was renovated; (5) the first phase of the polarized beam experiments was successfully accomplished in April 1--8, 1994, of polarized proton acceleration up to Gγ ∼ 20; (6) they are currently renovating tune jump quadrupoles in order to accelerate polarized proton up to 25 GeV/c. The full test of these experiments will be in 1995. During this funding period, the principal investigator has spent about 20% of his research time on this project, which includes the design and manufacturing of the solenoid partial snake, beam dynamics issues of the AGS with the 5% solenoid partial snake and spin dynamics of synchrotrons with snakes in general. The graduate student, Mr. H. Huang has spent 100% of his research time working on spin dynamics. The graduate student is currently staying at BNL for the E880 experiment preparation

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94015631; NTIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
DOE/ER/40747--10

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
26001607
Subject category
S43: PARTICLE ACCELERATORS; S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Progress Report
Descriptors DEI
BEAM DYNAMICS; BROOKHAVEN AGS; DATA ACQUISITION SYSTEMS; ION SOURCES; LINEAR ACCELERATORS; PERFORMANCE TESTING; POLARIMETERS; POLARIZED BEAMS; PROGRESS REPORT; RESONANCE; SOLENOIDS
Descriptors DEC
ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; DOCUMENT TYPES; DYNAMICS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; EQUIPMENT; MECHANICS; SYNCHROTRONS; TESTING

Optional Information

Contract/Grant/Project number
Contract FG02-92ER40747
Funding organization
USDOE, Washington, DC (United States).