Published 1995
| Version v1
Miscellaneous
Open
Control valve friction operational experience at Darlington NGD
Description
Proper installation of valve packing is an important part of ensuring that control valves operate as intended. Darlington NGD has developed a Valve Packing Program. This program combined with valve diagnostics has enabled the station to ensure that the operability of control valves is maintained after repacking. This paper outlines the process that is used for this. (author)
Files
29054826.pdf
Files
(371.3 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:72060ff0d3c693bad7c20919ceacd594
|
371.3 kB | Preview Download |
Additional details
Publishing Information
- Imprint Title
- Proceedings of the third international conference on CANDU maintenance
- Imprint Pagination
- 473 p.
- Journal Page Range
- p. 351-361
- Report number
- INIS-CA--0018
Conference
- Title
- 3. International conference on CANDU maintenance
- Dates
- 19-21 Nov 1995
- Place
- Toronto, ON (Canada)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 29054826
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- FRICTION; GRAPHITE; LEAK TESTING; PROGRAM MANAGEMENT; REACTOR COOLING SYSTEMS; REACTOR MAINTENANCE; REACTOR OPERATION; SEALS; VALVES
- Descriptors DEC
- CARBON; CONTROL EQUIPMENT; COOLING SYSTEMS; ELEMENTS; EQUIPMENT; FLOW REGULATORS; MAINTENANCE; MANAGEMENT; NONMETALS; OPERATION; REACTOR COMPONENTS; TESTING
Optional Information
- Notes
- 6 figs.