Published 1995 | Version v1
Miscellaneous Open

Control valve friction operational experience at Darlington NGD

Creators

  • 1. Ontario Hydro, Bowmanville, ON (Canada). Darlington NGD

Description

Proper installation of valve packing is an important part of ensuring that control valves operate as intended. Darlington NGD has developed a Valve Packing Program. This program combined with valve diagnostics has enabled the station to ensure that the operability of control valves is maintained after repacking. This paper outlines the process that is used for this. (author)

Files

29054826.pdf

Files (371.3 kB)

Name Size Download all
md5:72060ff0d3c693bad7c20919ceacd594
371.3 kB Preview Download
Part of:
Proceedings of the third international conference on CANDU maintenance

Additional details

Publishing Information

Imprint Title
Proceedings of the third international conference on CANDU maintenance
Imprint Pagination
473 p.
Journal Page Range
p. 351-361
Report number
INIS-CA--0018

Conference

Title
3. International conference on CANDU maintenance
Dates
19-21 Nov 1995
Place
Toronto, ON (Canada)

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
29054826
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
FRICTION; GRAPHITE; LEAK TESTING; PROGRAM MANAGEMENT; REACTOR COOLING SYSTEMS; REACTOR MAINTENANCE; REACTOR OPERATION; SEALS; VALVES
Descriptors DEC
CARBON; CONTROL EQUIPMENT; COOLING SYSTEMS; ELEMENTS; EQUIPMENT; FLOW REGULATORS; MAINTENANCE; MANAGEMENT; NONMETALS; OPERATION; REACTOR COMPONENTS; TESTING

Optional Information

Notes
6 figs.