Published February 1979
| Version v1
Journal article
Retubing for on-site modification of steam generators
Creators
- 1. Westinghouse Electric Corporation, Nuclear Steam Generation Systems Dept.
Description
A demonstration was conducted at the Westinghouse high bay facility at Tampa in which a PWR steam generator was disassembled and retubed in 62 days under simulated personnel radiation exposure conditions. The various stages in the process are detailed, with illustrations of many of the components. (U.K.)
Additional details
Publishing Information
- Journal Title
- Nucl. Eng. Int.
- Journal Volume
- 24
- Journal Issue
- 281
- Series
- Nucl. Eng. Int.
- Journal Page Range
- 48-51
- ISSN
- 0029-5507
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 10463631
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- MAINTENANCE; MOCKUP; PWR TYPE REACTORS; RADIATION HAZARDS; REPAIR; SIMULATION; STEAM GENERATORS; TUBES; WELDED JOINTS
- Descriptors DEC
- BOILERS; HAZARDS; HEALTH HAZARDS; JOINTS; REACTORS; STRUCTURAL MODELS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS